These are the ATS keywords, credentials, and software terms that recur across current geotechnical engineer job descriptions — organized so you can scan for what your resume is missing. Placement matters as much as presence: an ATS keyword buried in a skills list ranks lower than the same term used in context inside an experience bullet.
Title variants
- Geotechnical Engineer
- Senior Geotechnical Engineer
- Ground Engineer
- Foundation Engineer
- Geoenvironmental Engineer
- Tunnelling Engineer
- Slope Stability Engineer
- Earthworks Engineer
- GI Engineer
- Geo-structural Engineer
- Principal Geotechnical Engineer
Ground investigation
- CPTu
- CPT
- cone penetration test
- SPT
- standard penetration test
- N value
- N60
- borehole
- dynamic probing
- vane shear test
- pressuremeter
- plate load test
- laboratory testing
- triaxial
- CIU
- CAU
- CD
- oedometer
- consolidation
- Atterberg limits
- BS 1377
- BS EN ISO 22475
- MASW
- seismic CPT
- Vs30
- Eurocode 8 ground type
Design codes
- Eurocode 7
- EC7
- BS EN 1997
- DA1
- Design Approach 1
- Combination 1
- Combination 2
- BS 8004
- BS 8081
- CIRIA C574
- BS EN 1997-2
- UK National Annex
- GEO limit state
- UPL limit state
Software
- PLAXIS
- PLAXIS 2D
- PLAXIS 3D
- Mohr-Coulomb
- Hardening Soil
- Soft Soil Creep
- Cam-Clay
- GeoStudio
- SLOPE/W
- SEEP/W
- SIGMA/W
- WALLAP
- LimitState:GEO
- Settle3
- RS2
- RS3
- Rocscience
- FLAC
- MIDAS
- RocPlane
- Unwedge
- AutoCAD Civil 3D
- ArcGIS
- AGS
- KeyaGS
Foundation types
- bored pile
- CFA pile
- driven pile
- CAPWAP
- pile load test
- bearing capacity
- settlement
- differential settlement
- secant pile wall
- sheet pile
- soldier pile
- ground anchor
- soil nail
- spread foundation
- raft
- mat foundation
Slope stability
- SLOPE/W
- GeoStudio
- Bishop
- Spencer
- Morgenstern-Price
- factor of safety
- FS
- limit equilibrium
- shear strength reduction
- SSR
- undrained analysis
- drained analysis
- debris flow
- landslide
- inclinometer
- piezometer
- monitoring
Ground improvement
- vibro-compaction
- stone columns
- PVDs
- prefabricated vertical drains
- deep soil mixing
- DSM
- jet grouting
- JGP
- grouting
- lime stabilisation
- cement stabilisation
- vacuum consolidation
- ground freezing
- geosynthetics
Tunnelling
- TBM
- EPB
- slurry TBM
- volume loss
- settlement trough
- Gaussian trough
- NATM
- secant lining
- sprayed concrete lining
- SCL
- segmental lining
- convergence
- monitoring
- trigger level
Credentials
- CEng ICE
- CGeol GSL
- MIoM
- CIRIA
- ISSMGE
- ICE
Long-tail phrases
- geotechnical engineer resume
- geotechnical engineer cv
- how to write a geotechnical engineer resume
- geotechnical engineer resume 2026
- ground engineer resume
- foundation engineer resume
- PLAXIS geotechnical engineer resume
- Eurocode 7 geotechnical resume
- slope stability engineer resume
Pasting these terms into your resume verbatim without matching context can read as keyword stuffing to a human reviewer, even if it passes the ATS. The full Geotechnical Engineer resume guide shows where each category belongs and how to work it into real experience bullets.